PrimeCloudStack Cloud Continuity
Köln, DE › Cloud Infrastructure › Multi-Region Continuity

Resilient cloud topologies roasted for total operational continuity

We configure resilient multi-region cloud topologies, elastic serverless compute layers, and automated disaster recovery environments built for total operational continuity.

99.99% Continuity SLA
<15 min RTO Target
Multi-AZ Failover Ready
CONTINUITY_DASHBOARD HEALTHY
Primary Region eu-central-1
Failover Region eu-west-1
Replication Lag 0.4s

RPO

< 60s

RTO

< 15m

Request DR Blueprint
Engineering Catalog

Infrastructure services, cut with precision

Every engagement is scoped like a single-origin roast: measured inputs, documented process, and a result you can taste in uptime metrics.

Topology Multi-Region High Availability

Multi-Region Topology Design

End-to-end design of active-active or active-passive multi-region cloud topologies with deterministic traffic steering, data residency controls, and documented failover runbooks.

  • ✓ Regional residency & latency matrix
  • ✓ Active-active routing blueprint
  • ✓ Failover runbook & drill plan
Investment $2,400 · 3–4 weeks
Book Topology Review →
Compute Lambda / Cloud Run Event-Driven

Elastic Serverless Compute Layer

Production-grade serverless layers with cold-start profiling, concurrency guardrails, IAM least-privilege, and cost telemetry so capacity scales without surprise invoices.

  • ✓ Cold-start optimization suite
  • ✓ Concurrency & throttling policy
  • ✓ Per-function cost dashboards
Investment $1,800 · 2–3 weeks
Book Compute Session →
Continuity DRaaS Automated

Automated Disaster Recovery Environment

Turnkey DR environments with continuous snapshot pipelines, cross-region replication, one-click recovery orchestration, and quarterly failover drills with measurable RTO/RPO outcomes.

  • ✓ Cross-region snapshot automation
  • ✓ Orchestrated recovery playbooks
  • ✓ Quarterly failover drill reports
Investment $3,200 · 4–6 weeks
Book DR Blueprint →
IaC Terraform GitOps

Infrastructure as Code Pipeline

Terraform and Pulumi modules versioned in Git with policy-as-code gates, drift detection, and staged promotion from sandbox to production without snowflake environments.

  • ✓ Modular Terraform module library
  • ✓ Policy-as-code CI gates
  • ✓ Drift detection & auto-report
Investment $2,100 · 3 weeks
Book IaC Sprint →
Containers Kubernetes ECS / GKE

Container Orchestration Setup

Hardened Kubernetes or managed container clusters with autoscaling policies, secret rotation, observability agents, and blue/green release patterns for zero-downtime deploys.

  • ✓ Cluster hardening baseline
  • ✓ HPA / VPA autoscaling profiles
  • ✓ Blue-green & canary releases
Investment $2,600 · 3–5 weeks
Book Cluster Setup →
FinOps Cost Control Rightsizing

Cloud Cost Optimization Audit

A forensic pass over your billing and utilization data to surface idle resources, oversized instances, storage waste, and reserved capacity opportunities — with a prioritized savings roadmap.

  • ✓ Full billing & utilization teardown
  • ✓ Rightsizing recommendations
  • ✓ 90-day savings roadmap
Investment $1,200 · 2 weeks
Book FinOps Audit →
Observability Metrics · Logs · Traces OpenTelemetry

Observability & Telemetry Stack

Unified metrics, logs, and distributed tracing with actionable SLOs, anomaly alerting, and dashboards your on-call engineers actually trust during incidents.

  • ✓ OpenTelemetry instrumentation
  • ✓ SLO & error-budget policies
  • ✓ On-call incident dashboards
Investment $1,900 · 2–3 weeks
Book Observability Build →
Migration Zero Downtime Lift & Optimize

Zero-Downtime Cloud Migration

Phased migration of legacy workloads into modern multi-region cloud with traffic shadowing, cut-over rehearsals, and rollback safety nets so production never blinks.

  • ✓ Dependency mapping & wave plan
  • ✓ Traffic shadowing & validation
  • ✓ Documented rollback procedures
Investment $4,500 · 6–10 weeks
Book Migration Assessment →
Roastery Protocol

How we roast your infrastructure

A four-phase craft process — from green-field audit to full production continuity — documented at every stage.

Phase 01 · 3–5 days

Green-Field Audit

Inventory existing topologies, dependency maps, and continuity gaps before any heat is applied.

Phase 02 · 1 week

Blend Design

Architecture blueprints, region pairings, and cost models reviewed with your engineering leads.

Phase 03 · 2–6 weeks

Slow Roast Build

IaC modules, monitoring, and DR automation deployed in staging, then promoted with full observability.

Phase 04 · Ongoing

Cupping & Continuity

Quarterly drills, cost reviews, and runbook refreshes keep the stack sharp after handover.

Continuity Dispatch

Your next outage should be a drill, not a surprise

Share your current topology constraints and continuity targets. We respond with a scoped blueprint, pricing, and delivery timeline within one business day.